Computer Forums

Member Login

Remember Me? Sign Up! | Forgot Password
 
Slogan
 
Computer Forums > PC Technology Zone > Windows Operating Systems and Software » Handy Backup program how to manage full and incremental schedule
Reply
Old 10-11-2009, 02:01 AM   #1 (permalink)
 
True Techie

Join Date: Dec 2004

Posts: 204

zillah is on a distinguished road

Default Handy Backup program how to manage full and incremental schedule

Hi
I have got a client that is using Handy Backup from employees PCs (XP Profe) to a PC dedicated for backup only.

How can I configure a program to do an automatic full back up once a week and then incremental backups for rest of the week ?

What would the good practical advice for how long you have to accumulate a backup ?

Thanks
zillah is offline   Reply With Quote
Old 10-11-2009, 02:04 AM   #2 (permalink)
Osiris's Avatar
 

Join Date: Jan 2005

Location: Kentucky

Posts: 32,271

Osiris is a jewel in the roughOsiris is a jewel in the roughOsiris is a jewel in the roughOsiris is a jewel in the rough

Send a message via ICQ to Osiris Send a message via AIM to Osiris Send a message via MSN to Osiris Send a message via Yahoo to Osiris Send a message via Skype™ to Osiris
Default Re: Handy Backup program how to manage full and incremental schedule

http://www.2brightsparks.com/assets/...Back_Setup.zip
__________________
Osiris is offline   Reply With Quote
 
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On