Computers |
|
| | #3 (permalink) |
| Monster Techie | We have less than 4 months. ^-^. But yeah, it typically doesn't happen untill 2 months before.
__________________ Lenovo Thinkpad T60 Intel Core 2 Duo T7200 @ 2.00 Ghz 2 GB DDR-2 memory ATI Mobility Radeon x1400 60 GB 7200 rpm Hard Drive Windows Vista Ultimate 32 Bit |
| | |
| | #5 (permalink) |
| Monster Techie | If they can't guarantee you get it by christmas, then that is not what I call a pre-order.
__________________ Lenovo Thinkpad T60 Intel Core 2 Duo T7200 @ 2.00 Ghz 2 GB DDR-2 memory ATI Mobility Radeon x1400 60 GB 7200 rpm Hard Drive Windows Vista Ultimate 32 Bit |
| | |
| | #6 (permalink) |
| Super Techie Join Date: Dec 2004 Location: California
Posts: 378
| Hmmm, Nov. 17th. I'll be looking forward to hearing more news about it around that time. I'm looking to buy no matter what the cost is. Hope I do get it by Christmas, but it's awfully close.
__________________ Today is yesterday's future.... |
| | |